Maintenance of ETP [Effluent Treatment Plant]-SOP

Maintenance of ETP: This SOP [Maintenance of ETP] will make as per SOP for SOP of the respective company/Organization. Font/line spacing/Margin/Page set up/Header/Footer etc. will change as per requirement of SOP for SOP. 1.0 Purpose: The purpose of this SOP is to define the standard procedure of preventive maintenance of Effluent Treatment Plant [ETP] of […]


Maintenance of ETP: This SOP [Maintenance of ETP] will make as per SOP for SOP of the respective company/Organization. Font/line spacing/Margin/Page set up/Header/Footer etc. will change as per requirement of SOP for SOP.

Maintenance of ETP

1.0 Purpose:

The purpose of this SOP is to define the standard procedure of preventive maintenance of Effluent Treatment Plant [ETP] of XX Pharmaceuticals Ltd.

2.0 Scope: 

This Standard Operating Procedure applies to the Effluent Treatment Plant [ETP] of XX Pharmaceuticals Ltd.

3.0 Definitions/Abbreviation: 

ACF: Activated Carbon Filter

ETP: Effluent Treatment Plant

MGF: Multi Grade Filter

PAC: Poly Aluminum Chloride

PPE: Personal Protective Equipment

SOP: Standard Operating Procedure

4.0 Responsibilities: 

Engineering Department [Validation]:

Preparing the SOP & revise it when required

Engineering Department [Maintenance]:

To provide essential support for maintenance of the system.

To ensure that the operators are accountable to carry out the maintenance.

Operators

To perform the maintenance activities according to the SOP.

Head of Engineering

To confirm that the maintenance of ETP are done correctly.

Head of Quality Assurance

To ensure overall implementation of this SOP.

5.0 Revision Details

Sl. No./Version No./Effective Date/Change History to be add here

6.0 Annexure:

Annexure has been mentioned in bottom of the document with download link

Annexure-I: Maintenance log sheet of ETP

7.0 Procedure:

7.1 Precautions: All maintenance activities must be done safely in accordance with the necessities of the Plant Safety Declaration and the safety notices from place to place the plant. Specific consideration must be paid to the following:

  • Handle the chemicals by wearing PPE.
  • Ensure that the pumps are switched off before initiating any kind of maintenance.

7.2 System Description:

The capacity of ETP is 5000 Liter/hour. The effluents from the production department come into the neutralization and equalization tanks via bar screen chambers. In this bar screen chamber the floating material/solid material is being filtered. A dosing of lime is being delivered in the neutralization tank if pH correction is needed.

The effluents are aerated in this tanks with air which is delivered by the blowers. After being neutralized in the neutralization tank the effluents goes into the equalization tank & then the effluent is relocated to the flocculation tank through effluent transfer pumping system.

 

A dosing of PAC [Poly Aluminum Chloride] is delivered in the flocculation tank to flocculate all the effluents. Poly electrolyte dosing [PED] is delivered in the transferring pipe of effluents from flocculation tank to the lamella.

After lamella the effluent is passed to the aeration tank. In aeration tank the effluents are aerated with air. A dosing of NaOH[Sodium Hydroxide] is provided if it is required.

 

There is a buffer tank after the aeration tank where 1kg of urea will be delivered after every Two months of operation. There is a line under the buffer tank to transfer the sludge to underground sludge tank & then to sludge pit by sludge transfer pumping system.

Clear water from the Buffer Tank is stored in the clear water tank. There are two pumps to transfer the clear water to final storage tank through MGF [Multi Grade Filter] & ACF [Activated Carbon Filter]. One pump is used at a time.

7.3 Maintenance Procedure:

7.3.1 Maintenance of ETP will be performed according to the following check list:

Type of maintenance: Daily

Maintenance activities:

  • Clean the screen bar daily.
  • Clean the surrounding environment of ETP.

Type of maintenance: Weekly

Maintenance activities:

  • Clean the control panel.
  • Check the electrical control panel and electrical connection.

Type of maintenance: After 2 months

Maintenance activities:

  • Clean the dosing tank.

Type of maintenance: After 3 months

Maintenance activities:

  • Change the oil of blower/compressor.

Type of maintenance: Yearly

Maintenance activities:

  • Clean all the tanks
  • Change the gear oil
  • Clean the clear water tank

7.3.2 Fill up the log sheet (Annexure-I) after performing preventive maintenance of ETP.

Annexure:

Annexure-I: Maintenance log sheet of ETP